Services

 

•    Inspecting and evaluating the steel and/or paint condition providing steel and paint reports.

•    Attending vessels' inspections at shipyards all over the world
     (above1000 Vessels´ attendance so far).


•    Checking the quality and condition of the equipment.


•    Evaluating appropriate surface preparation
     (sandblasting, hydro jetting, evaluation of grades, Cleaning condition),
     climate conditions (and the proper ventilation), issuing relevant painting
     systems, checking the surface preparation and paint application,
     supervising responsibly for the quality of the surface treatment and
     paint system’s performance.


•    Supervising and evaluating the quality and performance of the
     Contractors’ teams.


•    Surveying and evaluating the present condition of each and any area.


•    Issuing daily progress, maintenance and inspection reports in English.


•    Responsible for representing the customer during vessels maintenance and
     negotiating with third parties.     

    

 

 

Types of Vessels attended

•    Private and corporate yachts
•    General cargo
•    Refrigerated carriers
•    Oil tankers
•    F.P.S.O
•    Product chemical tankers
•    Liquefied gas carriers
•    Bulk carriers
•    Containers
•    Ferries / passenger liners
•    Barges          
            

 


Vessels' areas of Supervising

•    Exterior hull
•    Cargo holds/tanks (internal)
•    Hatch covers
•    Ballast tanks
•    Duct keels
•    Sea chests
•    Bow thrusters
•    Void spaces
•    Decks
•    Accommodation (interior-exterior)
•    Engine room
•    Pipe lines

  

 


Indicative examples of previous experience               
 

 

BLOHM&VOSS, HAMBURG,GERMANY 

Painting Quality Managing

F.P.S.O. vessel (ENQUEST PRODUCER 1) refiting/maintenance.

Ballast Tanks and Cargo Tanks maintenance, Main Deck,Process Deck, Helli Deck, New Modules etc.

Owner ENQUEST. 

 

UBOLDI srl – Castellanza,Italy
TOTAL UK-LAGGAN TORMORE project, Blasting and painting with Phenolic paint system, 40 sea valves.
As a paint representative for AllSEAS company.
    
COSCO ZHOUSAN SHIPYARD, ZHOUSAN, CHINA
Container Ship, dry docking maintenance, cargo holds,ballast tanks.

 

WENCHONG SHIPYARD, GUANGZHOU, CHINA
Container Ship, dry docking maintenance, cargo holds,ballast tanks.
 
HANVICO HEAVY INDUSTRY&CONSTRUCTION CORPORATION (VIETNAM)
As a paint project manager on behalf of F.A.M. company.

 

BLOHM&VOSS, HAMBURG,GERMANY
F.P.S.O. vessel(MAERSK CURLEW) dry docking maintenance.
Ballast tanks and Cargo Tanks maintenance
Main Deck,Process Deck,Heli Deck etc.
Owner MAERSK SEALAND.

 

LISNAVE SHIPYARD, PORTUGAL
Three T-Class container vessels dry docking maintenance.
Full blasting SA 2,5 (entire hull area) painted with                  
Silicone foul release system, attended on behalf of the
Owner MAERSK SEALAND.

 

JURONG SHIPYARD (JSL), SINGAPORE
Six C-Class container vessels dry docking maintenance.
Full blasting SA 2,5 (entire hull area) painted with
Silicone foul release system, attended on behalf of the
Owner MAERSK SEALAND. 

 

WENCHONG SHIPYARD, GUANGZHOU, CHINA
Cape size Bulk Carriers dry docking maintenance, cargo holds,
ballast tanks, duct keels.


PUXI SHIPYARD, SHANGHAI, CHINA
General cargo vessel, dry docking maintenance: ballast tanks, cargo holds. 

 

PUXI SHIPYARD, SHANGHAI, CHINA
General cargo vessel, dry docking maintenance. 

 

NEW ATHENS AIRPORT - INDUSTRIAL PAINTING
Jet A1 Fuel Tanks, Horizontal underground-above portable tanks.
Representing Hempel by overseeing the surface treatment and the painting of all above-mentioned areas (internal-external)
Responsible for checking the safety of the scaffolding constructions, equipments quality and condition, evaluation of surface preparation with sandblasting SA 2 (ISO STANDARD), cleaning condition, climate conditions (and the proper ventilation), paint application, quality and performance of wet/dry film thickness. Responsible for the paint recoating intervals among the coats.

  

NEW BUILDING AT DAEDONG SHIPYARD, PUSAN, KOREA
Supervising of the four (4) new building vessels (Product tankers)from the shop primer painting until delivery (blockstage, erection stage, launching, etc). All communication in English.